Hilti Ireland on Twitter: "Are you looking to optimize your post-installed rebar calculation? Take a look into the new EOTA released design method - TR069 https://t.co/Gbb6ErGrRa https://t.co/dmhoQpBocS" / Twitter
Hilti - Are you an engineer designing for post-installed rebar, and struggling with static and seismic calculations? By using the Hilti PROFIS rebar software you can easily perform development and splice calculations
![Hilti is the first manufacturer to have two ICC-ES Reports for designing post-installed reinforcing bars| Concrete Construction Magazine Hilti is the first manufacturer to have two ICC-ES Reports for designing post-installed reinforcing bars| Concrete Construction Magazine](https://cdnassets.hw.net/44/40/6454cfb24d24b38311e91108b63f/hilti.jpg)
Hilti is the first manufacturer to have two ICC-ES Reports for designing post-installed reinforcing bars| Concrete Construction Magazine
![5 vertical rebar dowels post-installed with HIT HY 200 to develop horizontal shear - Structural engineering general discussion - Eng-Tips 5 vertical rebar dowels post-installed with HIT HY 200 to develop horizontal shear - Structural engineering general discussion - Eng-Tips](https://res.cloudinary.com/engineering-com/image/upload/v1493768625/tips/Capture2_hcwwbv.png)